If the reason for posting one SOP Invoice to two GL periods is Revenue Recognition. Look into Revenue and Expense Deferrals. In GP2013 it is included in the Starter Pack. In GP2010 and GP10 it was in the Advanced Mgmt BRL. Maybe a reason to consider moving to GP2013 sooner and not later.
Warren